Close Menu
  • Home
  • Stock
  • Parenting
  • Personal
  • Fashion & Beauty
  • Finance & Business
  • Marketing
  • Health & Fitness
  • Tech & Gadgets
  • Travel & Adventure

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

4 longevity mistakes that catch up to women after menopause

agosto 24, 2026

‘Lust-free’ gyms say they’re safe spaces for Christian men

agosto 21, 2026

Experimental ‘exercise pill’ may reduce appetite and mimic physical activity

agosto 21, 2026
Facebook X (Twitter) Instagram
  • Home
  • Contact us
  • DMCA
  • Política de Privacidad
  • Publicidad en DD Noticias
  • Sobre Nosotros
  • Términos y Condiciones
Facebook X (Twitter) Instagram
DD Noticias: Tu fuente de inspiración diariaDD Noticias: Tu fuente de inspiración diaria
  • Home
  • Stock
  • Parenting
  • Personal
  • Fashion & Beauty
  • Finance & Business
  • Marketing
  • Health & Fitness
  • Tech & Gadgets
  • Travel & Adventure
DD Noticias: Tu fuente de inspiración diariaDD Noticias: Tu fuente de inspiración diaria
Home » ISRO Sets June 2025 Launch for Joint NASA-ISRO NISAR Satellite After Delays
Technology & Gadgets

ISRO Sets June 2025 Launch for Joint NASA-ISRO NISAR Satellite After Delays

Jane AustenBy Jane Austenmayo 3, 2025No hay comentarios3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
ISRO Sets June 2025 Launch for Joint NASA-ISRO NISAR Satellite After Delays
Share
Facebook Twitter LinkedIn Pinterest Email


Indian Space Research Organisation (ISRO) has started the final preparation for one of its most highly anticipated global collaborations after a prolonged wait. The joint mission with the United States’ National Aeronautics and Space Administration (NASA) as the NASA-ISRO Synthetic Aperture Radar, or NISAR, is scheduled to take off in June 2025. The ambitious Earth observation satellite will have one of the largest and most advanced radar imaging systems ever to have been launched into space. When in operation, NISAR will offer a new window of the Earth’s surface, with critical information about Earth’s changing systems, natural hazards, and environmental change. When in operation, NISAR will offer a new window of the Earth’s surface, with critical information about Earth’s changing systems, natural hazards, and environmental change.

Technical Challenges and Assembly Progress

According to the news from NASA’s own NISER blog, the launch was initially planned for 2024. It was continuously postponed because of technical problems, such as concerns over the satellite’s 12-meter radar antenna reflector overheating. To enhance its reflective coating and manage temperature issues at deployment, the part was returned to NASA’s Jet Propulsion Laboratory (JPL) in 2024.

The satellite was completely constructed at ISRO’s Bengaluru headquarters by October 2024 after thorough retesting. In a multi-leg mission, NASA’s C-130 plane delivered essential gear to India, where it was completed by January 2025. ISRO is presently making pre-launch arrangements at the Satish Dhawan Space Centre (SDSC) in Sriharikota, to which the spacecraft has already been shifted. During a recent meeting with Science Minister Jitendra Singh, ISRO Chairman V. Narayanan proposed a 2025 launch window.

Mission Capabilities and Strategic Importance

The second phase of the Geosynchronous Satellite Launch Vehicle (GSLV) Mark II was dispatched to Sriharikota on April 26, 2025, and that marked the start of advanced launch campaign activities. Nisar will use dual-band radar (L-band and S-band) to scan the Earth’s surface every 12 days, detecting sub-centimeter changes in landforms, ice sheets, and ecosystems.. Its detailed data will support disaster management, climate studies, and infrastructure oversight.

The mission signifies a strengthening of Indo-US space relations and establishes ISRO as a crucial participant in worldwide Earth science efforts. If achieved, Nisar’s datasets might revolutionize comprehension of crustal deformations, glacier behavior, and variations in the carbon cycle.
Now that the GSLV is at SDSC and payload integration is in progress, ISRO is prepared to launch one of the most awaited space missions of 2025, subject to final agency approvals.

 



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Jane Austen
  • Website

Related Posts

Bitcoin Core v30 allenta OP_RETURN: Alcuni miner S19 affrontano una pressione di booster

noviembre 17, 2025

Bitcoin Core v30: No es una actualización — es presionar el 「booster de eliminación de mineros」

noviembre 17, 2025

Pika Labs Launches Social AI Video App on iOS, Unveils New Audio-Driven Video Generation AI Model

agosto 12, 2025
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Fast fashion pioneer Forever 21 files for bankruptcy — again

marzo 18, 2025

Dow gains 350 points as stocks climb for 2nd day after S&P 500 enters correction

marzo 18, 2025

Yellow Creditors Have Own Plan to Share Trucker’s $550 Million

marzo 18, 2025

Alphabet in Talks to Buy Startup Wiz for $30 Billion, WSJ Says

marzo 18, 2025
Top Reviews
DD Noticias: Tu fuente de inspiración diaria
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Home
  • Contact us
  • DMCA
  • Política de Privacidad
  • Publicidad en DD Noticias
  • Sobre Nosotros
  • Términos y Condiciones
© 2026 ddnoticias. Designed by ddnoticias.

Type above and press Enter to search. Press Esc to cancel.