Close Menu
  • Home
  • Stock
  • Parenting
  • Personal
  • Fashion & Beauty
  • Finance & Business
  • Marketing
  • Health & Fitness
  • Tech & Gadgets
  • Travel & Adventure

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

I was told I’d never walk again — now I’m trekking across the US

agosto 28, 2026

4 longevity mistakes that catch up to women after menopause

agosto 24, 2026

‘Lust-free’ gyms say they’re safe spaces for Christian men

agosto 21, 2026
Facebook X (Twitter) Instagram
  • Home
  • Contact us
  • DMCA
  • Política de Privacidad
  • Publicidad en DD Noticias
  • Sobre Nosotros
  • Términos y Condiciones
Facebook X (Twitter) Instagram
DD Noticias: Tu fuente de inspiración diariaDD Noticias: Tu fuente de inspiración diaria
  • Home
  • Stock
  • Parenting
  • Personal
  • Fashion & Beauty
  • Finance & Business
  • Marketing
  • Health & Fitness
  • Tech & Gadgets
  • Travel & Adventure
DD Noticias: Tu fuente de inspiración diariaDD Noticias: Tu fuente de inspiración diaria
Home » ISRO Successfully Tests SE2000 Engine for Next-Gen LVM3 Rocket Upgrade
Technology & Gadgets

ISRO Successfully Tests SE2000 Engine for Next-Gen LVM3 Rocket Upgrade

Jane AustenBy Jane Austenjunio 3, 2025No hay comentarios2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
ISRO Successfully Tests SE2000 Engine for Next-Gen LVM3 Rocket Upgrade
Share
Facebook Twitter LinkedIn Pinterest Email


The Indian Space Research Organisation (ISRO) successfully carried out the third hot test of its semi-cryogenic engine Power Head Test Article (PHTA) on 28 May 2025 at the ISRO Propulsion Complex (IPRC), Mahendragiri. The test is part of a series of performance evaluations aimed at validating key subsystems of the 2000 kN-class SE2000 engine that will eventually power the SC120 propulsion stage intended to replace the existing L110 liquid core stage of the LVM3 launch vehicle. ISRO began this series of performance evaluations in March 2025, focusing on critical components such as low- and high-pressure turbo-pumps, the pre-burner, the start-up system, and various control mechanisms.

The three-phased trials

According to the official ISRO press release, the PHTA has undergone two hot tests earlier, which included all systems except the thrust chamber. The first test on 28.03.2025 demonstrated the smooth ignition & bootstrap operation over a short duration of 2.5 seconds. The second hot test on 24.04.2025 demonstrated the start transient build-up and tested the start-up sequence by carrying out a hot-firing for a duration of 3.5 seconds. The third test was carried out for a duration of 3 seconds to fine-tune further & finalize the start-up sequence.

The SE2000 employs an oxidizer-rich staged combustion cycle using liquid oxygen and kerosene. It is able to deliver a chamber pressure of 180 bar and a specific impulse of 335 seconds—an upgrade over the L110 stage’s hydrazine-based propulsion.

Future Integration and Impact on Indian Launch Capability

With the subsystem validations complete, ISRO will now begin integrated engine-level trials, moving toward full operational readiness. The SC120 stage powered by SE2000 is expected to increase LVM3’s payload capacity from 4 to 5 tonnes to Geostationary Transfer Orbit (GTO) and from 8 to 10 tonnes to Low Earth Orbit (LEO).

 

For the latest tech news and reviews, follow Gadgets 360 on X, Facebook, WhatsApp, Threads and Google News. For the latest videos on gadgets and tech, subscribe to our YouTube channel. If you want to know everything about top influencers, follow our in-house Who’sThat360 on Instagram and YouTube.

Vivo Y19s Pro With 6,000mAh Battery, 50-Megapixel Rear Camera Launched: Price, Features

OnePlus Ace 6, OnePlus Ace 6 Pro Tipped to Debut With Snapdragon 8 Series Chips



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Jane Austen
  • Website

Related Posts

Bitcoin Core v30 allenta OP_RETURN: Alcuni miner S19 affrontano una pressione di booster

noviembre 17, 2025

Bitcoin Core v30: No es una actualización — es presionar el 「booster de eliminación de mineros」

noviembre 17, 2025

Pika Labs Launches Social AI Video App on iOS, Unveils New Audio-Driven Video Generation AI Model

agosto 12, 2025
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Fast fashion pioneer Forever 21 files for bankruptcy — again

marzo 18, 2025

Dow gains 350 points as stocks climb for 2nd day after S&P 500 enters correction

marzo 18, 2025

Yellow Creditors Have Own Plan to Share Trucker’s $550 Million

marzo 18, 2025

Alphabet in Talks to Buy Startup Wiz for $30 Billion, WSJ Says

marzo 18, 2025
Top Reviews
DD Noticias: Tu fuente de inspiración diaria
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Home
  • Contact us
  • DMCA
  • Política de Privacidad
  • Publicidad en DD Noticias
  • Sobre Nosotros
  • Términos y Condiciones
© 2026 ddnoticias. Designed by ddnoticias.

Type above and press Enter to search. Press Esc to cancel.