Close Menu
  • Home
  • Stock
  • Parenting
  • Personal
  • Fashion & Beauty
  • Finance & Business
  • Marketing
  • Health & Fitness
  • Tech & Gadgets
  • Travel & Adventure

Subscribe to Updates

Subscribe to our newsletter and never miss our latest news

Subscribe my Newsletter for New Posts & tips Let's stay updated!

What's Hot

4 longevity mistakes that catch up to women after menopause

agosto 24, 2026

‘Lust-free’ gyms say they’re safe spaces for Christian men

agosto 21, 2026

Experimental ‘exercise pill’ may reduce appetite and mimic physical activity

agosto 21, 2026
Facebook X (Twitter) Instagram
  • Home
  • Contact us
  • DMCA
  • Política de Privacidad
  • Publicidad en DD Noticias
  • Sobre Nosotros
  • Términos y Condiciones
Facebook X (Twitter) Instagram
DD Noticias: Tu fuente de inspiración diariaDD Noticias: Tu fuente de inspiración diaria
  • Home
  • Stock
  • Parenting
  • Personal
  • Fashion & Beauty
  • Finance & Business
  • Marketing
  • Health & Fitness
  • Tech & Gadgets
  • Travel & Adventure
DD Noticias: Tu fuente de inspiración diariaDD Noticias: Tu fuente de inspiración diaria
Home » NASA’s Lunar Space Station Module Enters Final Phase Before Artemis Gateway Launch
Technology & Gadgets

NASA’s Lunar Space Station Module Enters Final Phase Before Artemis Gateway Launch

Jane AustenBy Jane Austenmayo 2, 2025No hay comentarios2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
NASA’s Lunar Space Station Module Enters Final Phase Before Artemis Gateway Launch
Share
Facebook Twitter LinkedIn Pinterest Email


NASA’s Artemis program has passed a significant milestone in the development of the agency’s «Gateway» in the orbit of the Moon with the delivery of the Habitation and Logistics Outpost (HALO) module to Northrop Grumman’s facility in Gilbert, Arizona. Part of the moon-orbiting Gateway facility, HALO will serve as a habitat and office to astronauts and researchers travelling to and from the lunar surface under NASA’s Artemis moon program. Critical systems for power, data, life support, and temperature control are being attached to the module. Once finished, HALO will permit NASA and associates to conduct long-term missions and experiments in deep space as part of humanity’s lunar return.

NASA’s HALO Module Begins Final Outfitting for Artemis Lunar Gateway

As per the NASA report, the HALO module was shipped from Thales Alenia Space in Turin, Italy, on April 1, and the spacecraft was greeted during an April 24 viewing milestone. The gathering included remarks from NASA’s Lori Glaze, Gateway Program Manager Jon Olansen, and astronaut Randy Bresnik. Attendees such as NASA Administrator Senior Advisor Todd Ericson and local officials viewed the module and engaged in virtual reality tours showcasing its future role in lunar exploration. The event underscored HALO’s strategic importance to NASA’s lunar infrastructure.

At Northrop Grumman, engineers will install the core systems hardware into HALO, including propellant lines, thermal-control radiators, electric wiring, racks for avionics and other electronics, as well as the hardware to support the spacecraft’s life-support systems. Integration would also be designed for docking with Orion spacecraft, lunar landings and other visiting vehicles. This phase marks HALO’s transition from a basic structure to an operational habitat ready for rigorous space conditions.

ESA’s Lunar Link system will be installed on HALO for communication between lunar missions and Earth and will undergo rigorous environmental testing before launch. NASA is assembling the Power and Propulsion Element (PPE), a solar electric propulsion system, to support the Gateway station in lunar orbit. The 12-kilowatt thruster is currently being tested at Glenn Research Centre.

 



Source link

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Jane Austen
  • Website

Related Posts

Bitcoin Core v30 allenta OP_RETURN: Alcuni miner S19 affrontano una pressione di booster

noviembre 17, 2025

Bitcoin Core v30: No es una actualización — es presionar el 「booster de eliminación de mineros」

noviembre 17, 2025

Pika Labs Launches Social AI Video App on iOS, Unveils New Audio-Driven Video Generation AI Model

agosto 12, 2025
Add A Comment
Leave A Reply Cancel Reply

Editors Picks

Fast fashion pioneer Forever 21 files for bankruptcy — again

marzo 18, 2025

Dow gains 350 points as stocks climb for 2nd day after S&P 500 enters correction

marzo 18, 2025

Yellow Creditors Have Own Plan to Share Trucker’s $550 Million

marzo 18, 2025

Alphabet in Talks to Buy Startup Wiz for $30 Billion, WSJ Says

marzo 18, 2025
Top Reviews
DD Noticias: Tu fuente de inspiración diaria
Facebook X (Twitter) Instagram Pinterest Vimeo YouTube
  • Home
  • Contact us
  • DMCA
  • Política de Privacidad
  • Publicidad en DD Noticias
  • Sobre Nosotros
  • Términos y Condiciones
© 2026 ddnoticias. Designed by ddnoticias.

Type above and press Enter to search. Press Esc to cancel.